Assembling the rebar cages for the columns. Rick B     (0 votes)
|
|

This is a double pile footer arrangement. A single column will come out of this hole.Rick B     (0 votes)
|
|

Footer hole with single pile now ready for footer rebar cage. Pile was driven into ground about 1 meter below grade. Hole was prepared with compacted sand and cement, about 10cm thick each.Rick B     (0 votes)
|
|

Raising the ceremonial columns. Our ceremony involved two columns.Rick B     (0 votes)
|
|

Laying out the pile locationsRick B     (0 votes)
|
|

Piles being deliveredRick B     (0 votes)
|
|

Driving 7m long piles for the house footers. A total of 32 piles were driven for the house, which has a first floor foot print of 17.3m x 16.1m. Rick B     (0 votes)
|
|

Laying out the footer locations and dimensionsRick B     (0 votes)
|
|
|

|
|
|