|


Last additions - Rick B's Gallery |

View of side deckRick BJan 20, 2009
|
|

Rear and side view of houseRick BJan 20, 2009
|
|

The family chedi in the back yardRick BJan 20, 2009
|
|

View of driveway just pouredRick BJan 20, 2009
|
|

Random files - Rick B's Gallery |

Front fence line from upstairsRick B
|
|

Gypsum board installed and tapedRick B
|
|

Rebar and forms for the first floor beams are ready for the concrete pour. The top of the first floor is 115cm above grade to minimize problems should there ever be flooding.Rick B
|
|

View of side deck roof steel on leftRick B
|
|

View of front of perimeter wall and pedestrian gate before paintingRick B
|
|

This is a double pile footer arrangement. A single column will come out of this hole.Rick B
|
|
|

Raising the ceremonial columns. Our ceremony involved two columns.Rick B
|
|

|
|
|