|


| Last additions - Rick B's Gallery |

View of side deckRick BJan 20, 2009
|
|

Rear and side view of houseRick BJan 20, 2009
|
|

The family chedi in the back yardRick BJan 20, 2009
|
|

View of driveway just pouredRick BJan 20, 2009
|
|

| Random files - Rick B's Gallery |

Outside thai kitchen counter finishedRick B
|
|

Alligning Window FrameWe used mai takien for our frames and windows. Here they're alligning one of the living room windows before cementing it in place.Rick B
|
|

Front of House with First Floor BlockworkWindow and door frames and blockwork for the first floor nearing completion.Rick B
|
|

Side deck before railing is installedRick B
|
|

Rear and side view of houseRick B
|
|

Upper Roof Nearing CompletionAll but the edge tiles over the front roof are now installed on the upper roof. Second floor block work and window/door frames are also complete.Rick B
|
|

Living Room Front WindowThis window frame will have four opening windows and a non-opening glass center.Rick B
|
|

Floor slabs being laid over first floor beams. The 6mm rebar seen embedded into the floor beams will be bent over the floor slabs and tied to the wire mesh laid over the floor slabs prior to pouring an additional 5cm of concrete on top of the floor slabs. This makes the finished floor ~ 10cm thick.Rick B
|
|

|
|
|