Vibrating the concrete for the first pilecap / footingIansMar 24, 2011
|
|

The bucket brigadeIansMar 24, 2011
|
|

Form work and reo'IansMar 24, 2011
|
|

The concrete handling equipmentIansMar 24, 2011
|
|

| Random files - Ians's Gallery |

The whole builing has been has been setout with "string-lines" (actually fishing line) to ensure all footings etc are in the correct location.Ians
|
|

Vibrating the concrete for the first pilecap / footingIans
|
|

The site-office finished. Equipped with aircon, fridge, radio, desk, whiteboard - all modern conveniences. Ians
|
|

A 3 D of our planned home. Influenced by Mediteranian and Aussie style houses. Veranda all round, cavity brick on all external walls, 3 metre ceilings in bedrooms etc with 4 metre in the lounge and living area's. Ians
|
|

Form work and reo'Ians
|
|

The skeleton of the de-mountable air-conditioned site office being erected.Ians
|
|

The bucket brigadeIans
|
|

The concrete handling equipmentIans
|
|

|
|
|