All footing holesThe JCB has finished the initial digging.
20 Dec.'08pklongball
|
|

22 MayThis photo and one more may look rather odd but wifey and I decided to add something to the back steps when they apply the final sand wash. So we bought a box of 4 inch square tiles to add to the layer of sand wash. This is our attempt as to how we want them placed and the spacing. We feel it will look pretty goodpklongball
|
|

June 26The kitchen with some color added. Mrs picked a yellow paint scheme with some green tile and smaller yellow and white accent tiles.pklongball
|
|

11 March 2009The outer kitchen wall up o the level needed for the lintel beam install. On a wall with no windows a beam will be built in about halfway up the height of the wall.pklongball
|
|

Valentine's Day 2009So we now have a poured floor and this brings an end to this phase of the build. Next week brings the beginning of the roof steel work and maybe morepklongball
|
|

June 30Here we have the Electric man wiring the first of two lamp fixtures with the electronic ballasts need to light the lights.pklongball
|
|

June 23It took a couple of hours but when done it took 10 loads of dirt and a little work to get it leveled out. Cost 8500 for the dirt and tractor.pklongball
|
|

June 23Here is Tile man 1's main helper. She does all the finish work after tile man sets the tile. In this case the granite install cleaning and finish groutpklongball
|
|

|
|
|