July 21Homeworks delivered our new bed on schedule but we could not let them set it up yet as the built in people have the bedroom full of cabinets and tools and other debris. We ended up setting up the bed ourselves late the night of the 25th after the cabinet people left.pklongball
|
|

30 MayThe front step area that is being prepared for the concrete walk way.pklongball
|
|

2 column hole2 Jan. '09 This footing hole as all the others are being readied for the footing rebar and column rebar and concrete. The bottom of the hole is layered with concrete.pklongball
|
|

1 AprilHere is Sparky patching some work around the boxes in the wallpklongball
|
|

Khun Apple measuring the layoutKhun Apple is just starting the measurement process for the house layout.
15 Dec.'08pklongball
|
|

Jan.30,2010Almost finished but this is the view of the piping both water and electric.pklongball
|
|

20 MayNow we have floor tile in the master bedroom. This tile has a simulated woodgrain look.pklongball
|
|

June 10Work has moved to the point of the almost finished look for the window. These panels will be a double bi-fold to each side to allow the opening.pklongball
|
|

|
|
|