![](images/spacer.gif)
|
![Filename=VT2BEFORE.youtube
Filesize=0KiB
Dimensions=0x0
Date added=Sep 28, 2011 VT2BEFORE.youtube](albums/userpics/10002/thumb_VT2BEFORE.jpg)
Condition Prior to Remodel ClipThis clip shows the condition of the condo prior to the remodel, especially the bathroom. dozer
|
|
![Filename=IMG_1656.jpg
Filesize=265KiB
Dimensions=1280x960
Date added=Sep 28, 2011 IMG_1656.jpg](albums/userpics/10002/thumb_IMG_1656.jpg)
Original View ToiletThe original view of the toilet and stained tile area.dozer
|
|
![Filename=IMG_1657.jpg
Filesize=190KiB
Dimensions=1280x960
Date added=Sep 28, 2011 IMG_1657.jpg](albums/userpics/10002/thumb_IMG_1657.jpg)
Original View BathtubThis bathtub was leaking and needed to be either replaced with another tub or as we decided a shower enclosure.dozer
|
|
![Filename=IMG_3019.jpg
Filesize=312KiB
Dimensions=1280x960
Date added=Sep 28, 2011 IMG_3019.jpg](albums/userpics/10002/thumb_IMG_3019.jpg)
Original Kitchen GraniteThe kitchen granite counter will stay, our job was to try to match it as close as possible at the granite factory.dozer
|
|
![Filename=IMG_3109.jpg
Filesize=398KiB
Dimensions=1280x960
Date added=Sep 28, 2011 IMG_3109.jpg](albums/userpics/10002/thumb_IMG_3109.jpg)
Don't Buy a ToiletDon't buy the toilet first until checking the the distance between the center of the waste hole and the wall (yes, we knew that, especially since we heard of others having the problem).dozer
|
|
![Filename=IMG_3115.jpg
Filesize=230KiB
Dimensions=1280x960
Date added=Sep 28, 2011 IMG_3115.jpg](albums/userpics/10002/thumb_IMG_3115.jpg)
Tile RemovalThe tile removal took longer than anticipated.dozer
|
|
![Filename=IMG_3117.jpg
Filesize=258KiB
Dimensions=1280x960
Date added=Sep 28, 2011 IMG_3117.jpg](albums/userpics/10002/thumb_IMG_3117.jpg)
Existing Above Ceiling AreaThese pipes in the ceiling area are from the condo above. dozer
|
|
![Filename=IMG_3118.jpg
Filesize=412KiB
Dimensions=1280x960
Date added=Sep 28, 2011 IMG_3118.jpg](albums/userpics/10002/thumb_IMG_3118.jpg)
Removing Existing SinkThe above counter mount sink was removed and this granite counter will be removed.dozer
|
|
![Filename=IMG_3127.jpg
Filesize=331KiB
Dimensions=960x1280
Date added=Sep 28, 2011 IMG_3127.jpg](albums/userpics/10002/thumb_IMG_3127.jpg)
Laying in the PlumbingEstablishing the pluming for the new faucets, drain, electric water heater and washing machine. The orange flexi tubing will be used for the hot water piping.dozer
|
|
![Filename=IMG_3131.jpg
Filesize=394KiB
Dimensions=1280x960
Date added=Sep 28, 2011 IMG_3131.jpg](albums/userpics/10002/thumb_IMG_3131.jpg)
FlintkoteStarting to flintkote the floor area. dozer
|
|
![Filename=IMG_3136.jpg
Filesize=332KiB
Dimensions=1280x960
Date added=Sep 28, 2011 IMG_3136.jpg](albums/userpics/10002/thumb_IMG_3136.jpg)
Electric in CeilingLaying in the electric in the ceiling area for the new lights, ceiling fan and water heater.dozer
|
|
![Filename=IMG_3137.jpg
Filesize=266KiB
Dimensions=1280x960
Date added=Sep 28, 2011 IMG_3137.jpg](albums/userpics/10002/thumb_IMG_3137.jpg)
Preparing for New Control BoxPreparing the wiring for a new square D electrical panel.dozer
|
|
|
![](images/spacer.gif)
|
|
|