IMG_1420.jpg
Support ColumnThe part of the column above the footing and below the ground.dozer00000
(0 votes)
IMG_1419.jpg
Poured Support ColumnA poured support column (the part of the column under the floor). The guide lines are visible which indicate where the middle of each column should be. dozer00000
(0 votes)
IMG_1418.jpg
Column FormworkThe formwork for the support column on top of the footing is done using cinder blocks which will stay in place after the pour. dozer00000
(0 votes)
IMG_1335.jpg
Column Framework set in PlaceThe column frameworks are held upright by using pieces of 1 x 3" timber. dozer00000
(0 votes)
IMG_1333.jpg
FootingFinishing off the top of one particular footing, height of 35 cm. dozer00000
(0 votes)
IMG_1330.jpg
Footing and Column FrameworkThe footing frame and the column framework in place. Spacers are at the bottom and side. dozer00000
(0 votes)
IMG_1297.jpg
House RaisingHere is the house raising do hicky that will be used during the celebration to raise the first post. The bag of 1000 baht notes is for show only although we did throw quite a few coins in the post holes.dozer00000
(0 votes)
IMG_1285.jpg
Footing FrameThe footing frame in place with 5 cm. spacers on the bottom and the upright rebar indicating the center of the footing. dozer00000
(0 votes)
IMG_1284.jpg
Excavating a FootingThe cinder blocks will be used as formwork for the footing. dozer00000
(0 votes)
IMG_1277.jpg
Column LayoutThe boards on the outside of the building area are for attaching the layout lines which indicate the positions of each footing/column. dozer00000
(0 votes)
IMG_1275.jpg
LayoutA piece of nylon string and 3mm rebar indicating the middle of a particular column. dozer00000
(0 votes)
IMG_1274.jpg
Footing FrameThe footings holes will each be 1 meter wide by 1 meter long by 1 meter deep. The footing frame is placed in 35 cm of concrete at the bottom of each footing hole. This is a pic of 5 of them stacked on top of each other.dozer00000
(0 votes)