happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Top rated - Cool Thai House Phase 2
IMG_2466.jpg
Recessed LightInstalling one recessed lighting fixture. dozer00000
(0 votes)
IMG_2261.jpg
Main Circuit BoxThe eventual location where the main circuit box will go. dozer00000
(0 votes)
IMG_2259.jpg
Routing ConduitRunning conduit to its appropriate location. Notice that long lengths are wired to the roof structure to prevent sagging. dozer00000
(0 votes)
IMG_2244.jpg
Neat Conduit LayoutConduit positioned in preparation for the recessed lighting and other ceiling electrics.dozer00000
(0 votes)
IMG_2224.jpg
Junction BoxesThe PVC plastic junction boxes are set in place which the screw type connectors. dozer00000
(0 votes)
IMG_2223.jpg
Electric Running to Main CircuitWhere the main electric control box will be. dozer00000
(0 votes)
IMG_2157.jpg
Underground Electric ConduitThe underground electric conduit as it runs in a trench. dozer00000
(0 votes)
IMG_2051.jpg
Kitchen ElectricElectrics for kitchen lighting above and below the cabinets along with a switch box and two receptacle boxes. dozer00000
(0 votes)
IMG_2018.jpg
Kitchen ElectricThis is a switch and receptacle box that will go above the kitchen counter.dozer00000
(0 votes)
IMG_2014.jpg
Junction Box in WallA sunken junction box with a screw type connector. dozer00000
(0 votes)
IMG_2012.jpg
Control RoomThe control room for the CCTV system and LAN. Each box accommodates 3 RG6 cables and there are boxes for the CAT5 internet cable plus electric. dozer00000
(0 votes)
IMG_1837.jpg
Destination for the Main PanelThe main electric control panel will be fitted above these lengths of electric conduit.dozer00000
(0 votes)
437 files on 37 page(s) 29

Debug Info 
Debug Output: show / hide