Desk FittingThe installer adjusting the cut and edged granite to have the same overhang on all sides. dozer     (0 votes)
|
|

DeskOne desk with the granite top installed, the other ready to go. dozer     (0 votes)
|
|

Silicone AdhesiveUsing sony brand silicone adhesive to glue the granite top to the desk. dozer     (0 votes)
|
|

Applying AdhesiveThe granite installer is laying down the silicone adhesive.dozer     (0 votes)
|
|

Adjusting the Counter TopThe countertop being adjusted. dozer     (0 votes)
|
|

Faucet Holed On-SiteEdging and under mount sink holes are done in the factory, everything else is done on-site. Here the hole for the sink faucet is being drilled.dozer     (0 votes)
|
|

Faucet Hole DrillingWater is applied to keep the bit from getting too hot. dozer     (0 votes)
|
|

Final Adjustment Stove Top AreaFinal adjustment on the area where the stove top will fit in. dozer     (0 votes)
|
|

Sink OpeningThe sink opening for an undermount sink is always cut at the factory, the stove opening will be cut on-site.dozer     (0 votes)
|
|

Granite Top SetTwo of the granite top pieces are set in place to check the fit. The stove top opening will be cut on-site. dozer     (0 votes)
|
|

Final CracksAny slight openings are grouted by the installers.dozer     (0 votes)
|
|

Concrete SlurryThe mix used to concrete the granite counter top to the base.dozer     (0 votes)
|
|