Precast slab delivery/unloadingchiyman     (0 votes)
|
|

Pre cast concrete slabs used to form the first floor being deliveredchiyman     (0 votes)
|
|

A hoist put in position for lifting concrete to first floor for final casting of the first floor slab on top of the precast slabs.chiyman     (0 votes)
|
|

Precast Slabs placed and formwork ready for pouring 50mm cover of concretechiyman     (0 votes)
|
|

Placing the first floor pre cast slabs, removal of first floor beam formwork and placement of first floor slab mesh reinforcement.chiyman     (0 votes)
|
|

Precast slabs in place forming the first floor - note the hole left is for the stairwell.chiyman     (0 votes)
|
|

Lifting the precast ploor slabs into position on the first floor beams
chiyman     (0 votes)
|
|

Roofing material and steel in the background.chiyman     (0 votes)
|
|

First Floor Beams completed - formwork will be removed once the concrete has properly cured.chiyman     (0 votes)
|
|

Completed First floor beams - awiting removal of formwork once the concrete has cured.chiyman     (0 votes)
|
|

The larger white dog was in fact a male. I think the puppy was hungry. The dog then urinated on the puppy!! which made the construction worker owner rather cross!chiyman     (0 votes)
|
|

Placing the steel reinforing mesh on the first floor precast slabschiyman     (0 votes)
|
|