Car portThis is another cost saver that looks like crap. I had asked for a different color, but somehow the contractor "forgot." Really, it's just a place to keep my ride out o' the rain. somdet     (1 votes)
|
|

The front of the houseA coat of primer has been slapped on. The driveway is finished. It's starting to look like a house.somdet     (1 votes)
|
|

building forms for the columnsGood thing they are wearing their work sandals!somdet     (2 votes)
|
|
|

slabs laid over the beams. 10cm of cement will be poured on top of this.somdet     (1 votes)
|
|
|

The footing has been poured. A small guage wire form was used inside. Maybe 2 hun (but not sure)somdet     (1 votes)
|
|

The front will be slightly more decorative.somdet     (1 votes)
|
|
|

One wall rendered one wall unfinishedsomdet     (1 votes)
|
|

Pre-fab columnssomdet     (1 votes)
|
|

The bottom section of blocks finished.somdet     (1 votes)
|
|