|

Top rated - User galleries |

Wire ties on footings rebarUsing wore ties to attach the footing rebar together.Max&Bee-in-CM     (0 votes)
|
|

Tools of the tradeMetal cutter, cost 5000 bahtMax&Bee-in-CM     (0 votes)
|
|

Moving dirt aroundThe macro truck dumps the dirt near the sides, it will be used later to fill the holes in.Max&Bee-in-CM     (0 votes)
|
|

Column rebarMaking the internal rebar for the columnsMax&Bee-in-CM     (0 votes)
|
|

Lots of rebarAlot of work to get through...Max&Bee-in-CM     (0 votes)
|
|

Foundation holesQuite deep, the main holes are 2 m deepMax&Bee-in-CM     (0 votes)
|
|
|
|
|
|
|

standard steel concrete constwe priced steel vs wood framing steel was 38k vs wood at 56k tbat so i opted steel cement
not as astetic as wood but am sure termitus etus lessus z cement/steelotis-a     (0 votes)
|
|
5254 files on 438 page(s) |
 |
 |
 |
 |
 |
282 |  |
 |
 |
 |
|

|
|
|