|

Top rated - User galleries |

RocksThr rock pile that is used to line the bottom of the foundation holesMax&Bee-in-CM     (0 votes)
|
|

Macro hard at workTrying to finish off all the holes. Max&Bee-in-CM     (0 votes)
|
|
|
|

the plot with simple layoutthe plot accquired due to proximity to family, later was added fill (abt. 1.3m) & set 3 moons or 5 rains for consolidation. A bit of consternation but upon seeing construction, no worries. Seems the area norm. P/L = property line, Fill=area filled to elevate above road and drain ditchesotis-a     (0 votes)
|
|

footing hole going down all in!normal steel cement const. chaing raiotis-a     (0 votes)
|
|

column formsnormal steel cement const. chaing raiotis-a     (0 votes)
|
|

q/c team make steel inspectionnormal steel cement const. chaing raiotis-a     (0 votes)
|
|

beams going innormal steel cement const. chaing raiotis-a     (0 votes)
|
|

columns 1st levelnormal steel concreteotis-a     (0 votes)
|
|
|

Local small governmentHad to go to the local government office to lodge the building plans, after they had been signed by an engineer.Max&Bee-in-CM     (0 votes)
|
|
5254 files on 438 page(s) |
 |
 |
 |
 |
 |
279 |  |
 |
 |
 |
|

|
|
|