|

Top rated - User galleries |

Storm brewing....Those clouds look menacingMax&Bee-in-CM     (0 votes)
|
|

Foundations dryFoundations and columns are dry, waiting for the macro to back fill soil.Max&Bee-in-CM     (0 votes)
|
|
|

All colunns driedReady for soil to be back filled.Max&Bee-in-CM     (0 votes)
|
|

Rebar for foundation beamsLots of work coming up twisting, cutting and attaching.Max&Bee-in-CM     (0 votes)
|
|
|
|
|

Sunset from the landI love the colors of the sunset over the mountainsMax&Bee-in-CM     (0 votes)
|
|

All columns doneAll the foundations and columns have been poured and are drying.Max&Bee-in-CM     (0 votes)
|
|

DryingConcrete has been poured for foundations and columns, and is drying now.Max&Bee-in-CM     (0 votes)
|
|

Inside the rebar columnLooking down inside the rebar and the concrete column.Max&Bee-in-CM     (0 votes)
|
|
5254 files on 438 page(s) |
 |
 |
 |
 |
 |
275 |  |
 |
 |
 |
|

|
|
|