|

Top rated - User galleries |

Front porchThe front porch was incorrectly placed about 20 cm below the level of the house floor, so they had to redo it today.Max&Bee-in-CM     (0 votes)
|
|

Attaching the formworkLots of sticks are used to reinforce the formwork.Max&Bee-in-CM     (0 votes)
|
|

Ground beams rebar doneAll the rebar for the ground beams has been completed. Next step is the form work for the concrete.Max&Bee-in-CM     (0 votes)
|
|

Toilet, bathroom and bedroomLooking at the toilet in the front of the picture, the bathroom on the right, and the small bedroom next to it on the left.Max&Bee-in-CM     (0 votes)
|
|

The meals areaLooking at the meals area at the rear left of the house.Max&Bee-in-CM     (0 votes)
|
|

A cross connectA cross connect for the rebar. I like how they bend the rebar to squeeze it inside the column.Max&Bee-in-CM     (0 votes)
|
|
|

View from the entrance corridorStanding just inside the entrance, on the left is the master bedroom.Max&Bee-in-CM     (0 votes)
|
|

Master bedroomAnther view of the master bedroom rebar ground beam, being held up by a stick as we didnt get enough soil infill.Max&Bee-in-CM     (0 votes)
|
|

Right angle rebarCloseup of the rebar work for the right corner of the house, the study room.Max&Bee-in-CM     (0 votes)
|
|

Front right cornerLooking at the front right of the house, from the study room to the master bedroom.Max&Bee-in-CM     (0 votes)
|
|

Master bedroomThe rebar ground beams for the master bedroom on the left, looking at the front of the house.Max&Bee-in-CM     (0 votes)
|
|
5254 files on 438 page(s) |
 |
 |
 |
 |
 |
272 |  |
 |
 |
 |
|

|
|
|