Gutter and soffitGalvanised guttering worked out at about 178 baht per metre, installed.jazzman     (0 votes)
|
|

Side Deck RoofWork on the side deck roof support steel is now underway. This roof will also extend to the rear of the house to cover the outdoor Thai kitchen.Rick B     (0 votes)
|
|

Upper Roof SteelThe upper roof support steel is in place. This work took about one week from start to this point.Rick B     (0 votes)
|
|

Installing Roof Tile BattensThese two guys are up 10 meters in the air. I don't even want to think about the safety issues that were ignored here!Rick B     (0 votes)
|
|

Upper RoofReflective foil and roof tiles are being laid in place.Rick B     (0 votes)
|
|

Upper Roof Nearing CompletionAll but the edge tiles over the front roof are now installed on the upper roof. Second floor block work and window/door frames are also complete.Rick B     (0 votes)
|
|

Upper Roof StartingAfter the second floor was poured, they began installing the upper roof steel. Rick B     (0 votes)
|
|

Front of House with First Floor BlockworkWindow and door frames and blockwork for the first floor nearing completion.Rick B     (0 votes)
|
|

Living Room Front WindowThis window frame will have four opening windows and a non-opening glass center.Rick B     (0 votes)
|
|

Alligning Window FrameWe used mai takien for our frames and windows. Here they're alligning one of the living room windows before cementing it in place.Rick B     (0 votes)
|
|

View of Side and Rear of HouseProBlock being layed for first floor exterior walls.Rick B     (0 votes)
|
|