|
Top rated |

Site preparationPi Lek, confident, doesn't know yet what's ahead of him for the next few monthsthomas.fontaine     (0 votes)
|
|
|
|
|

4 AprilFrom the right front corner we can see a hip area that needs the cap tiles and this will just about complete the tile work. A few more in the areas close to the bottom of the two big gables and then the gable work and the roof will be finished.pklongball     (0 votes)
|
|

4 AprilAnd from the back right corner we can see gables that need finishing and the master bedroom door opening and the back verandapklongball     (0 votes)
|
|

4 AprilThis shot of one of the valley areas of the roof. Nice job on all the valleys and I would have expected this as I have seen this man's work on other builds my builder has donepklongball     (0 votes)
|
|

4 AprilAnd now the back left corner view showing us the long roof valley that was done very well in my opinion. The tile fitter spent a lot of time cutting the tile to get a good tight, straight line down this valley.pklongball     (0 votes)
|
|

4 AprilFrom the left front view we can see the roof gable is the next finish that needs to be done.pklongball     (0 votes)
|
|

4 AprilIn this view from the driveway entry we can get a heads on view of the now 99% finished tile.pklongball     (0 votes)
|
|

1 AprilLay brickie working her way up another interior wall. Not too much more block and the walls will be uppklongball     (0 votes)
|
|

1 AprilLiving room widow rough opening with the first coat of cement on it.pklongball     (0 votes)
|
|
7141 files on 596 page(s) |
 |
 |
 |
 |
 |
526 |  |
 |
 |
 |
|

|
|
|