Support member to add strength to the wall section, along with view of more drainage pvc pipes. dozer     (0 votes)
|
|

Placing of 3 inch PVC pipe used to aid drainage, placed at the lower level of the wall. dozer     (0 votes)
|
|

Preparing for the pour of the upper ring beam. The metal is being affixed in place prior to the form work being affixed. dozer     (0 votes)
|
|

Cinder block wall prior to render. Note that he columns were poured after the blocks were laid to prevent cracking/weakness at the junction. dozer     (0 votes)
|
|

The footing for the bathroom. The ground beam will be on top of this.dozer     (0 votes)
|
|

The external bathroom footing with the rebar footing pad in place. dozer     (0 votes)
|
|

Side view of the house, still partially finished. The bathroom is in the rear (with two glass blocks). dozer     (0 votes)
|
|

Approximate wall thickness after rendering, about 8 cm. dozer     (0 votes)
|
|
|

The interior after the pour of the floor and walls rendered. The floor was poured 8 - 10 cm and broomed rough in preparation for floor tiles. dozer     (0 votes)
|
|

After the exterior walls have been rendered. dozer     (0 votes)
|
|

The exterior prior to rendering the surface. dozer     (0 votes)
|
|