Original Kitchen GraniteThe kitchen granite counter will stay, our job was to try to match it as close as possible at the granite factory.dozer     (0 votes)
|
|

Original View BathtubThis bathtub was leaking and needed to be either replaced with another tub or as we decided a shower enclosure.dozer     (0 votes)
|
|

Original View ToiletThe original view of the toilet and stained tile area.dozer     (0 votes)
|
|

Water HeaterA new Stiebel water heater was installed along with a VRH stainless shower head. dozer     (0 votes)
|
|

Walkthrough of Finished CondoA quick walk through of the completed condo. It was re-tiled and painted in just 4 days. dozer     (0 votes)
|
|

Grout LineThe scissors show that there is no residual concrete in the grout line (prior to grouting) when the tiles are laid in dry pack manner.dozer     (0 votes)
|
|

Tool for Applying a FittingThis type of tool is needed to slightly enlarge the opening prior to attaching a compression fitting. dozer     (0 votes)
|
|

Flexi Pipe CuttingThe flexi pipe must be cut with a proper pipe cutting tool to keep the edges smooth.dozer     (0 votes)
|
|

Electric Outlet w Tele JackNew electric outlet with a telephone jack.dozer     (0 votes)
|
|

Finished Floor SectionThe finished tile floor with skirting of the original tiles. The painting of the walls, ceiling and trim is also complete. dozer     (0 votes)
|
|

Original BathrooomThe bathroom after the new water line is attached near the toilet. The floor was partially re tiled. dozer     (0 votes)
|
|

Putty AppliedWall putty is applied to smooth the area where the new electric outlet is. dozer     (0 votes)
|
|