|

Most viewed - Cool Thai House Phase 2 |

Metal Screen49 viewsAn aluminum based screening material being used here. This is much more expensive than the vinyl type eventually used and not noticeably more durable. dozer
|
|

Wood Trim49 viewsWood trim installed around the columns by the ceiling guys needed to be reworked because some of the joints were not done properly. dozer
|
|

Cabinets49 viewsKitchzo kitchen cabinets as installed. dozer
|
|

Gas Melting Station48 viewsHere is the rig they used to melt the PVC piping in place. dozer
|
|

Hand Scoring the PVC Pipes48 viewsHere the PVC pipe is grooved. The grooved pieces are not used in the first 8 meters (the top most part is non grooved). They are used at the bottom of the well to allow water to seep in and replenish the supply. dozer
|
|

Drywall Sheeting48 viewsA room after the sheeting is affixed to the frame work, prior to taping, plastering and sanding. This particular room doesn't have a step. dozer
|
|

Mounting the Upper Cabinets48 viewsStarting to Mount the Upper Cabinetsdozer
|
|

Installing Shelving Unit48 viewsThe shelving units are installed with anchor bolts to the inside of the concrete structure. dozer
|
|

Exterior Ceiling Frame47 viewsInstalling the horizontal members of the aluminum frame on the exterior of the house. dozer
|
|

Lintel47 viewsThe form work for a lintel above a door opening. dozer
|
|

Franklin Pump46 viewsA view of the pump without the exterior housing. dozer
|
|

Cutting PVC for another Try46 viewsThis was the first well attempt. The lower portion collapsed and was discarded under ground. dozer
|
|
437 files on 37 page(s) |
 |
 |
 |
 |
 |
20 |  |
 |
 |
 |
|

|
|
|