Most viewed - Cool Thai House Phase 2 |

Study59 viewsSmall sandstone tiles are used on the wall area of the study.dozer
|
|

Bedroom58 viewsThe other side of the bedroom with the bathroom off to the right. The ceilings are stepped/trimmed in this room.dozer
|
|

Bathroom #258 viewsShower enclosure the same as in bathroom number 1. dozer
|
|

Remote Switch57 viewsThe remote switch for the one extra exterior light that we wired in after the fact. dozer
|
|

Level Establish for Outer Step57 viewsThe level is established for the outer step (60cm wide x 15cm high) as a first step in putting into place the frame work. Notice that these aluminum L shape pieces used for ties work much better than any type of wire. dozer
|
|

Two Types of Screening57 viewsTwo types of screening are installed under the smart board. The screen prevents insects entering the attic area since the smart board is vented. dozer
|
|

Adjusting the Opening57 viewsHere the door opening is being adjusted. dozer
|
|

Secured Storage57 viewsA utility/secured storage room with a bunk bed in it. The roll up doors in this unit are split with a small and large section. dozer
|
|

Setting Toilet Drain56 viewsSetting the toilet at the correct distance per the plan. dozer
|
|

Ceiling Secured Room56 viewsThis was the framing of the secured room where the ceiling is actually under a security level of metal welded together. The framework is tied to the security frame in this case, normally it is affixed to the roofing metal. dozer
|
|

Door Painting56 viewsOil based paint (TOA Glipton) applied to louvered solid hardwood bathroom door. dozer
|
|

Short One Switch55 viewsWe decided later we needed one additional eves light. There is a remote switch for the box so no hard wired switch is needed. dozer
|
|