|
![](images/spacer.gif)
Most viewed - Cool Thai House Phase 2 |
![Filename=IMG_1330.jpg
Filesize=527KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1330.jpg](albums/userpics/10002/thumb_IMG_1330.jpg)
Footing and Column Framework156 viewsThe footing frame and the column framework in place. Spacers are at the bottom and side. dozer
|
|
![Filename=IMG_1285.jpg
Filesize=502KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1285.jpg](albums/userpics/10002/thumb_IMG_1285.jpg)
Footing Frame138 viewsThe footing frame in place with 5 cm. spacers on the bottom and the upright rebar indicating the center of the footing. dozer
|
|
![Filename=IMG_1420.jpg
Filesize=578KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1420.jpg](albums/userpics/10002/thumb_IMG_1420.jpg)
Support Column136 viewsThe part of the column above the footing and below the ground.dozer
|
|
![Filename=IMG_1449.jpg
Filesize=613KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1449.jpg](albums/userpics/10002/thumb_IMG_1449.jpg)
Corner Framework129 viewsCorner section showing beam rebar intersection with the column. dozer
|
|
![Filename=IMG_1333.jpg
Filesize=534KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1333.jpg](albums/userpics/10002/thumb_IMG_1333.jpg)
Footing128 viewsFinishing off the top of one particular footing, height of 35 cm. dozer
|
|
![Filename=IMG_1428.jpg
Filesize=643KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1428.jpg](albums/userpics/10002/thumb_IMG_1428.jpg)
Ground Beam128 viewsThe rebar framework for the ground beam. The beams were 40 cm by 20 cm wide. The beams will sit on top of the existing soil level and the floor will sit on top of the beams. dozer
|
|
![Filename=IMG_1419.jpg
Filesize=568KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1419.jpg](albums/userpics/10002/thumb_IMG_1419.jpg)
Poured Support Column124 viewsA poured support column (the part of the column under the floor). The guide lines are visible which indicate where the middle of each column should be. dozer
|
|
![Filename=IMG_1575.jpg
Filesize=554KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1575.jpg](albums/userpics/10002/thumb_IMG_1575.jpg)
Form work for Ground Beam122 viewsCinder block formwork for the ground beam with wood on the outside. dozer
|
|
![Filename=IMG_1607.jpg
Filesize=592KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1607.jpg](albums/userpics/10002/thumb_IMG_1607.jpg)
Damp Course put in Place122 viewsUsing a heavier plastic that doesn't tear easy like the saran wrap type ones normally used. This is designed to keep moisture from seeping into materials above it. In addition a waterproofing agent is used on the floor pour.dozer
|
|
![Filename=IMG_1961.jpg
Filesize=430KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1961.jpg](albums/userpics/10002/thumb_IMG_1961.jpg)
Poured Ring Beam121 viewsA poured ring beam with U shaped rebar to keep it in place. This is in a section that used 20 cm. thick wall. dozer
|
|
![Filename=IMG_1430.jpg
Filesize=566KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1430.jpg](albums/userpics/10002/thumb_IMG_1430.jpg)
Beam and Column Intersection117 viewsThe beam and column are contiguous rebar that will be concreted in place. dozer
|
|
![Filename=IMG_1479.jpg
Filesize=534KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1479.jpg](albums/userpics/10002/thumb_IMG_1479.jpg)
Form work for Ground Beam117 viewsStarting the form work for the ground beam. On the inside it will be cinder block and on the other side it will be form wood (which is removed after the pour).dozer
|
|
437 files on 37 page(s) |
1 |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
|
![](images/spacer.gif)
|
|
|