|

Most viewed - Original Coolthaihouse Info |

17 viewsWith a new housing development, outside electric will need to be run into the development by the electric department, as in this example. This road was given to the county, ie. it is now a public road, but the installation must still be paid by private funds. In this example, the cost for the project (for the entire street) was 35,000 Baht. (12-Jul-04)dozer
|
|

17 viewsThe base is cemented in place with a cement pour around 30 cm thick. dozer
|
|

17 viewsTo add strength the blocks are cemented in place prior to pouring the supporting posts. The posts will be poured 'around' the blocks. Standard sizes for facing walls is 4 blocks high, the back sides are 7 blocks high. (24-Jan-04) dozer
|
|

17 viewsThis is the entry way reserved for the walk in gate.dozer
|
|

17 viewsThe support post is poured around the adjacent blocks using a form structure. dozer
|
|

17 viewsOne thing missing here! There is supposed to be a piece of metal extending out of the rows of blocks into the post area to add strength. Many people don't do this - you need to request it. (12-Jun-04)dozer
|
|

17 viewsLaying a brick in place.dozer
|
|

17 viewsA close up showing that the post was poured before the blocks were laid in, not after.dozer
|
|

17 viewsThe paving stones are set in place.dozer
|
|

17 viewsView of planter boxes from patio. (22-Aug-04)dozer
|
|

16 viewsThe metal support structures for the house use metal of guage 4 hun full with the cross supports 3 hun full. They are temporarily held upright by a wood support. (29-Feb-04)dozer
|
|

16 viewsThe wire being snipped in place. dozer
|
|
329 files on 28 page(s) |
 |
 |
 |
 |
 |
11 |  |
 |
 |
 |
|

|
|
|