|

Most viewed - Max&Bee-in-CM's Gallery |

Front right corner102 viewsLooking at the front right of the house, from the study room to the master bedroom.Max&Bee-in-CM
|
|
|

First few holes101 viewsThe first hole is dug, followed quickly by 2 moreMax&Bee-in-CM
|
|
|
|

Master bedroom99 viewsAnther view of the master bedroom rebar ground beam, being held up by a stick as we didnt get enough soil infill.Max&Bee-in-CM
|
|

Levelling99 viewsthe level thing is my second favorite tool, even the Thai workers at site started using it more often.Max&Bee-in-CM
|
|
|
|
|

The (incompetent?) roof metal guy thinks about how to jack up the roof98 viewsMaybe incompetent is too strong a word - but he was quick to assign blame to poor quality metal, bad architect, bad engineer, CPAC tiles too heavy, roof too big, etc - everyone except himself.Max&Bee-in-CM
|
|

Moving dirt around97 viewsThe macro truck dumps the dirt near the sides, it will be used later to fill the holes in.Max&Bee-in-CM
|
|
307 files on 26 page(s) |
 |
 |
4 |  |
 |
 |
 |
 |
 |
 |
|

|
|
|