23 March 2009195 viewsThe start of the electrics includes switch boxes. In this case 4 boxes near the front door to control lights in the house and on the veranda and also the car parking area. You can see the traditional method of mounting the box on a horizontal plane.pklongball
|
|

15 April195 viewsThe back veranda and the plaster work they just finished.pklongball
|
|
|

July 10195 viewsThe sit down shower is also a Hang unit. The Towel bar/rack and wall hanger also Hangpklongball
|
|

Sitting area194 viewsThe sitting area with imported leather sofa and marble coffee table.MsDozer
|
|
|

194 viewsLooking down from the stairs, this is going to be the library areaGlenn
|
|
|

26 March 2009194 viewsSo we come to the panel with no cover and no breakers installed. This is a 3 phase panel in case anyone is wonderingpklongball
|
|

193 viewsBattens going on the roof. Tiles are screwed into these.Thaifu T
|
|
|

26 Feb 2009193 viewsAnother view of some of the steel work. I am surprised at how much cutting and fitting needs to be done. But these guys are up to it and from my perspective they are doing a great job.pklongball
|
|