Master Bedroom Curtains & Aircon31 viewsMitsubishi 18,000 BTU (Mr Slim) 25,000 bahtchangnoi
|
|
|

A hoist put in position for lifting concrete to first floor for final casting of the first floor slab on top of the precast slabs.31 viewschiyman
|
|

Pre cast concrete slabs used to form the first floor being delivered31 viewschiyman
|
|
|

Formwork for window lintel being constructed31 viewschiyman
|
|
|

Garage footing holes31 viewsThe footing holes 1x1x1m for the garage are digged.
I want the garage done asap to get a clean place to rest in the shadow...and to have a dry place for materials!
Size of Garage 6.5x6.5m with 2.25x5m opening...20cm load bearing wall on 15cm slab with 50x20cm foundation (6x 4hun rebar)