|

Most viewed - User galleries |
|
|
|

Concrete poured i and waiting for it to cure before removal of the forms.35 viewschiyman
|
|

Lifting the precast ploor slabs into position on the first floor beams35 views
chiyman
|
|

Precast slab delivery/unloading35 viewschiyman
|
|

Columns constructed and window lintel for full height windows in place. The formwork will be removed once the concrete has cured35 viewschiyman
|
|
|
|

35 viewsVibrating the concrete for the first pilecap / footingIans
|
|

Building Area View 135 viewsLand to be filled to level where we stood.Super8man
|
|

Cement bathtub in outdoor courtyard/bathroom.35 viewsI had this 1/2 ton cement bathtub constructed offsite at a factory in Phuket. Because the istallation of the tub is in an outdoor courtyard, we could'nt use a standard prefabricated air-jet fiberglass tub. The sun's U.V. rays would have eaten-up a fiberglass tub inside 6 months.
Have a look at the other folders for how we built it and had it installed.verticalift
|
|
5254 files on 438 page(s) |
 |
 |
 |
 |
 |
357 |  |
 |
 |
 |
|

|
|
|