|

Most viewed - User galleries |

Dec 20 2010 450 viewsAs the roof was being made ready, so was the floors.fgrossiii
|
|
|
|
|

Installing Damp Proofing & Mesh49 viewschangnoi
|
|
|

The Unloading the tiles story went something like this.49 viewsMe: So Project Manager when the 3000 tiles arrive how will they unload and get to the first floor so the guys can lay the tiles.
Project Manager: No worries they are coming with a fork lift like they did the cement
Thai Foreman: jdhfjhjfhjhhryuryr ( In english no they arn't )
Me: Hey what you doing with my tiles I've waited so long for and love them so much you need to take real care
Thai Delivery Guy : roit ; lnsdg neg (In english no worries we will)
changnoi
|
|
|

Our Glass Block Window in Stairway49 viewschangnoi
|
|

columns 1st level49 viewsnormal steel concreteotis-a
|
|

Back left boundary marker49 viewsShown is the chanote tin-din land boundary marker located at the rear left of the land. A concrete post will be built, which will be significantly stronger than the purchased posts, to reinforce the fence.Max&Bee-in-CM
|
|

Locks On Doors49 viewsThe same external door lock on the same wrong doorchangnoi
|
|
5254 files on 438 page(s) |
 |
 |
 |
 |
 |
297 |  |
 |
 |
 |
|

|
|
|