|

Most viewed - User galleries |

June 2885 viewsDirt man and Mrs talking over what we want done.pklongball
|
|

A column pit85 viewsOne of the pits prior to the column going in. Interesting the different layers of soil and there colours.changnoi
|
|

Column rebar85 viewsMaking the internal rebar for the columnsMax&Bee-in-CM
|
|

Columns positioned85 viewsThe rebar columns are positioned for the concrete pour.Max&Bee-in-CM
|
|

Levelling the concrete85 viewsThe worker directing the concrete pour and leveling the concrete.Max&Bee-in-CM
|
|

Metal shuttering85 viewsWe rented metal shuttering for the columns. Cost = 3,650 baht for a few weeks.Max&Bee-in-CM
|
|

Laundry85 viewsThe rebar for the ground beams of the laundryMax&Bee-in-CM
|
|

Master bedroom85 viewsThe rebar ground beams for the master bedroom on the left, looking at the front of the house.Max&Bee-in-CM
|
|

Toilet, bathroom and bedroom85 viewsLooking at the toilet in the front of the picture, the bathroom on the right, and the small bedroom next to it on the left.Max&Bee-in-CM
|
|

Formwork complete85 viewsLooking at the middle rear of the houseMax&Bee-in-CM
|
|
|

Wire ties85 viewsI found the simple frame and wire tires were much quicker to build and hold the posts than the old frame i started with, dont know why I didnt do the simple option first.Max&Bee-in-CM
|
|
5254 files on 438 page(s) |
 |
 |
 |
 |
 |
201 |  |
 |
 |
 |
|

|
|
|