|

Most viewed - User galleries |
|

Closer Look at the columns next to the well87 viewschangnoi
|
|

Footing rebar87 viewsAlot of rebar made in a few days by 3 or 4 people, impressive.Max&Bee-in-CM
|
|

Foundation holes87 viewsThey made a rock/soil mold for the concrete pour at the bottom of the hole.Max&Bee-in-CM
|
|

Deep holes87 viewsThe foundation holes are deep, about 2 metre each.Max&Bee-in-CM
|
|

Bamboo fence lady87 viewsThe smiling and friendly lady at the wooden shop. She gave a good deal of 100 pieces of bamboo fence at 3 m long by 2.5 m high, for 300 baht each. Total cost = 30,000 baht. We paid 1,000 baht deposit, and it should take 2 to 3 weeks for the pieces to be built. Delivery to site included. Max&Bee-in-CM
|
|

Column form-molds complete87 viewsLooking at the rear of the houseMax&Bee-in-CM
|
|

roof387 viewssmall as mmsotis-a
|
|

87 viewsOur 3 phase, the last 2 phases were a 2 month wait. rucus7
|
|

Soil infill and roof work progresses together87 viewsMax&Bee-in-CM
|
|

Beams for making the truss structure are painted87 viewsMax&Bee-in-CM
|
|

The Electical Authority man with his wife - they were perfectly charming. He did his work very professionally and also helped with the breaker installation. Thanks.87 viewschiyman
|
|
5254 files on 438 page(s) |
 |
 |
 |
 |
 |
197 |  |
 |
 |
 |
|

|
|
|