|

Most viewed - User galleries |

kitchen cabinets, first look94 viewsShastadad
|
|
|

path stones, gravel, and grass installed94 viewsShastadad
|
|
|
|
|

18 April93 viewsIf you take a close look here you can see the crew has started adding the insect net and the Sherawood to the gable/eaves now after they built the wood vents.pklongball
|
|

5 May93 viewsHere we have one of the 2 half walls that will create the wet and dry areas for the master bath shower and toilet. This was just built in the last day or so.pklongball
|
|

8 May93 viewsHere we have Sparky number 2 getting a length of flex conduit ready for install.pklongball
|
|

19 May93 viewsIn this shot Sparky is guiding the pull rope into the PE pipe. They started with a pull wire/cable and attached a pulling rope and attached this to the NYY cable.pklongball
|
|

93 viewsjust love the scaffoldgeordie
|
|

93 viewsfront sun area nearly donegeordie
|
|
5254 files on 438 page(s) |
 |
 |
 |
 |
 |
183 |  |
 |
 |
 |
|

|
|
|