|
Most viewed |

Evening in Pattaya.419 viewsWhere i spend my lazytime.tintin
|
|

419 viewsKitchen counters being builtRick B
|
|

View of Side and Rear of House418 viewsProBlock being layed for first floor exterior walls.Rick B
|
|
|

417 viewsForms for the first floor beams are being assembled.Rick B
|
|

416 viewsMaster bathroom with wall and floor tiles installedRick B
|
|

415 viewsAn upstairs bedroom, ready for a few coats of paint.Thaifu T
|
|

Form work414 viewsThis shows the nearly completed form work.dozer
|
|

The process have started412 viewstrehanse
|
|
|

Hinges411 viewsSold in pack of four. Not the very cheapest but far from luxury, these cost 199 baht per pack at HomePro.
We install three per door.jazzman
|
|

Concrete Compressive Strength Verification411 viewsThis report shows the results of the compressive strength test on the concrete samples taken by the quality control staff. It is a good verification as the quality of the concrete used in the foundation is significant.dozer
|
|
7141 files on 596 page(s) |
 |
 |
 |
 |
 |
26 |  |
 |
 |
 |
|

|
|
|