Last additions - chiyman's Gallery |

Formwork for ground beamsI checked carefully to ensure that there was sufficient space between the reinforcement and the wooden formwork. Some adjustment was necessary. If the steel dosent have a concrete cover (of sufficent thickness) then it will be exposed to the atmosphere and will corrode. At best this will show as a dirty brown mark on the exterior of the structure and at worst, over time could cause structural failure.chiymanJan 18, 2011
|
|

putting the ground beams in place.chiymanDec 27, 2010
|
|

The workers camp with excess concrete being used for a place for washing. The workers like to stay in the tent which they regarded as more professional than constructing their own accommodation!!chiymanDec 27, 2010
|
|

The Electical Authority man with his wife - they were perfectly charming. He did his work very professionally and also helped with the breaker installation. Thanks.chiymanDec 27, 2010
|
|

Ground beams being placed in position on top of the below groung columns - lots of water applied to consolidate the footings.chiymanDec 27, 2010
|
|

The Electric man came to give us power!chiymanDec 27, 2010
|
|

The Electric man came to give us power 2!chiymanDec 27, 2010
|
|

In control of the water connectionchiymanDec 27, 2010
|
|

Water connection from the villiage supply from the Klong - so long as the chap in charge remembers to turn the pump on!chiymanDec 27, 2010
|
|
|

Footings poured and concrete pipes cropped to the correct level for further constuction and attachment of the ground beams. This method saved a lot of time.chiymanDec 27, 2010
|
|

Ditto previos photographchiymanDec 27, 2010
|
|
160 files on 14 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |