|

Last additions - Bathroom |

Each of the septics are vented off to the rear as shown here. (21-Aug-04)dozerSep 28, 2011
|
|

Stainless septic exhaust cover installed. (09-Jul-04)dozerSep 28, 2011
|
|

Prep work for the septic exhaust cover. (08-Jul-04dozerSep 28, 2011
|
|

Large bathroom sink. This is one of those minor annoyances. This sink was placed a little too near the wall which means one needs to bend forward to use it.dozerSep 28, 2011
|
|

Large bathroom bathtub and toilet.dozerSep 28, 2011
|
|

Small bathroom sink.dozerSep 28, 2011
|
|

Completed small bathroom, toilet and shower enclosure. (06-Jul-04)dozerSep 28, 2011
|
|

Bathtub tiled in. (27-Jun-04)dozerSep 28, 2011
|
|

Bathtub in the process of being framed. The bathtub is being sized here. After this two more rows of supporting bricks were added, for a total of 4 supporting rows. (25-Jun-04)dozerSep 28, 2011
|
|

Heavy duty drainage assembly being attached to the bathtub. Note; this is a heavy duty acrylic bathtub.dozerSep 28, 2011
|
|

This is a critical piece of plumbing which is used under the bathtub. Without it, for one thing, foul smells can flow in through the bathtub from the water septic. (24-Jun-04)dozerSep 28, 2011
|
|

The plumber finishing off the shower enclosure.dozerSep 28, 2011
|
|
44 files on 4 page(s) |
1 |
 |
|

|
|
|