Bang Saray House Build

Postby rchapstick » Thu Aug 17, 2017 5:52 am

Land before buid.jpg
I wanted to post my build story here on CTH. Let me start out by saying this is a retrospective story. The house is built, the property is fully landscaped, and we have settled into domestic bliss

Shout outs to pattayapope and fredlk who helped me immeasurably with the planning process.

A bit about myself. I've been coming to Thailand regularly for work for almost 18 years. I've been with the same Thai woman for nearly 13 years, and we trust each other implicitly. So lets dispense with the "her family is trying to rip me off" stuff at the start. Should something happen to her, and since I cannot own land in Thailand, I have taken necessary legal precautions to protect my investment. Lets leave it at that.

As I knew I planned to retire in Thailand, Mrs. BC and I decided to start looking for a property in 2010. We wanted to leave near the ocean, and neither of us had a desire to live in Pattaya proper. However, the area south of Pattaya was intriguing, as it afforded access to shopping and healthcare that Pattaya offered, without the big city downsides. So we quickly focused on this area. We looked a A LOT of stuff .... both existing houses and lots. I would have preferred an existing house, but I really didn't like anything we saw. Houses were either poorly built, over-priced, or in a poor location (or some combination of the three). We both had some pretty specific ideas of what we wanted, and eventually focused more on lots we could build on.

The problem with buying real estate in Thailand is the opacity of the process and thus, the opacity of the market prices. There are numerous properties that are offered "for sale" (including a sign) where the owner really isn't interested in selling, but would gladly accept an offer that is well above market. So if, say the market is 3mm per rai, they will price it at 5mm. If the market rises to 5mm, they raise the asking price to 7mm. So you really have to ask around a lot. Some real estate agents are useful to talk to, but most are not. It was also helpful to have Mrs. BC scout locations and ask around without me. She spent a lot of time talking to anyone and everyone in Baan Amphur, Na Jomtien, Bang Saray, and Sattahip about land for sale.

Finally, in 2011, we stumbled across a property with a motivated seller in Bang Saray. It ticked all the boxes ... town not too big or too small, level lot, rectangular size, 1 rai. Some negotation, and we agreed upon the price. Had the land office stake out the property, reviewed the chanote, and closed within a month.

Our next process was to build a wall, and add soil. The property was slightly below the road level, and we anted to raise it above that level. I could have just put in dirt and waited for it to settle, but I didnt want the fill to just wash away. So we had a stone wall built. For some reason, my photos of that process have gone MIA, so you will have to trust me on this. Once the wall was built, it was time to add soil. My initial thought was to add about 0.5 meters of soil ... Mrs. BC had different ideas and proceeded to add about 1.5 meters. My bad for not being clear with her before we build the 2.5 meter wall. Oh well, we'll deal with this later in another installment.

Anyway .... I give you to the first photo. Finished wall, added soil. Then we waited while the soil settled.
rchapstick
 
Posts: 72
Joined: Sun Oct 23, 2011 9:22 am

Re: Bang Saray House Build

Postby rchapstick » Thu Aug 17, 2017 5:58 am

Next order of business was to come up with a house plan. We looked at the government house plans you can get for free online, but we didn't find anything close to what we wanted. So we started looking at architects.

Architects, like builders in Thailand, often come in one of two flavors: absurdly overpriced or incompetent ... often both! The process is then to interview anyone and everyone you can find that has built a house to find a decent and reasonably priced architect. After lots of discussions, we decided on a young-ish guy who had designed a couple of houses in Sattahip. He was reasonable, and his customers said he was easy to work with.

The plan was to build a property with a guest house, and build the big house later, when I retired. I had also seen properties that had a separate "system room" that housed the electrical and water (not together). Without getting into too much detail of the process (largely driven by our individual requirements, this is what we came up with.

render1.JPG
rchapstick
 
Posts: 72
Joined: Sun Oct 23, 2011 9:22 am

Re: Bang Saray House Build

Postby rchapstick » Thu Aug 17, 2017 6:50 am

Here is the overall plan for the property, and the floor layouts of the bungalow and the main house.

scan(1).jpg


scan0003.jpg
]

scan0003.jpg
Attachments
scan0002.jpg
scan0001.jpg
rchapstick
 
Posts: 72
Joined: Sun Oct 23, 2011 9:22 am

Re: Bang Saray House Build

Postby Saffles » Thu Aug 17, 2017 9:55 am

Nice floor plan... looks comfortable and spacious.

Mark
User avatar
Saffles
 
Posts: 98
Joined: Sun Jul 06, 2014 10:20 pm

Re: Bang Saray House Build

Postby pipoz » Thu Aug 17, 2017 6:03 pm

That is a pretty good looking/solid wall, that you have around it.

Can I ask, how deep into the existing ground level does it go

pipoz
User avatar
pipoz
 
Posts: 1879
Joined: Mon Jan 23, 2012 10:41 pm
Location: Udon Thani Sometimes

Re: Bang Saray House Build

Postby rchapstick » Fri Aug 18, 2017 12:17 am

pipoz wrote:That is a pretty good looking/solid wall, that you have around it.

Can I ask, how deep into the existing ground level does it go

pipoz



2 meters down, 2.5 meters up
rchapstick
 
Posts: 72
Joined: Sun Oct 23, 2011 9:22 am

Re: Bang Saray House Build

Postby rchapstick » Fri Aug 18, 2017 6:18 am

Once you have a plan, you need to get your plans approved at the local municipal office. In Bang Saray, this is further complicated because much of the land, including ours, is "Navy Land" ... meaning it was once given to someone who served in the Navy. So we also needed to get approval of the build from the Navy. Both are straight forward, though lengthy, processes. While we were getting the OK, we started interviewing builders.

I cannot stress enough how important it is to select the right builder. Browse thru the forum here, and you will thread after thread after thread with horror stories about Thai builders. This is because:

There are no building codes, and no inspections to pass building codes
Most builders will hire literally anyone off the street and call them a construction worker. Skilled tradesmen are rare.
Anti-defamation laws really restrict you from saying anything bad about your builder, no matter how true.

So, in my opinion, the key to finding a good builder is to talk to as many people as you can that have built a house, privately, and ask about their experiences. Visit their house. Have your Thai spouse talk to their Thai spouse. You also need to understand how houses are built in Thailand. This forum has a wealth of information, and shall long be thankful to those before me who contributed their knowledge and stories over the years.

While the workers are all Thai (or Cambodian or Burmese), the owners are sometimes farangs. Some are good, some are not. There are a couple of "Alans" that post here and other boards are examples of farang owned builders.

Once you've narrowed down your search, you need to ask some specific questions of the builder. Who will be on site every day? Who is the foreman, and how long have they been with you? Who is on the crew, and how long have they been with you? Also, if you are away sometimes, as I was, you need to know how they will communicate with you and with your Mrs. Do you have someone else that will help you, and how with they communicate with you.

Lastly, if you are lucky enough to find a decent builder, then you have to find out when they are available, and how that works with your timeline.

Let me say up front that I was extremely lucky to find my builder ... a Thai guy and his nephew out of Huay Yai, recommended by pattayapope. He spoke decent enough English, but more importantly, he was fanatical about the quality of the build. 80% of his crew had been with him for more than 5 years, and his foreman had been with him for nearly 10 years. He had stellar recommendations from several references (thai and farang), and he was available. Pricing was not the cheapest, but not even close to the most expensive. I have, and would recommend him without reservation.
rchapstick
 
Posts: 72
Joined: Sun Oct 23, 2011 9:22 am

Re: Bang Saray House Build

Postby rchapstick » Fri Aug 18, 2017 6:19 am

One other point to make on project management. An engineer needs to sign off on the design of the project, and is also supposed to sign off on the the actual build. Most builders employ their own engineer, and will usually rubber stamp whatever their boss wants to do. However, I insisted that the engineer report to me, and I specified points in the build that he would inspect (pilings, footings, steel for structural beams, etc.) I also got an electrical engineer to review the electric plan, and to inspect and sign off at a couple of points during the build. My builder had no problem with this, and it was money well spent, if but of piece of mind.
rchapstick
 
Posts: 72
Joined: Sun Oct 23, 2011 9:22 am

Re: Bang Saray House Build

Postby rchapstick » Fri Aug 18, 2017 6:30 am

Start of the Bungalow Build

The local municipal engineer said that, based on previous builds in the area, I would need pilings 6m to 8m deep. I opted for 8 meters. I also decided to do the pilings for the big house and the small house at the same time, even though we were delaying the big house build for a few years. The reasoning is that it is much cheaper to pound the pilings in (rather than screw them in), but you really should not have any adjacent structures to the piling operation. Being present for the piling operation, I can tell you that is a wise choice. The earth literally shook when they were driving the piles.

Overall, the plan called for 56 pilings: 12 for the bungalow, and 44 for the big house.



On to the photos ...

image(3).jpeg


image(16).jpeg


image(10).jpeg


image(15).jpeg


image(13).jpeg


image(23).jpeg


image(22).jpeg
rchapstick
 
Posts: 72
Joined: Sun Oct 23, 2011 9:22 am

Re: Bang Saray House Build

Postby rchapstick » Fri Aug 18, 2017 6:39 am

image(9).jpeg


image(11).jpeg


image(30).jpeg


image(33).jpeg


image(39).jpeg


image(24).jpeg


image(27).jpeg
rchapstick
 
Posts: 72
Joined: Sun Oct 23, 2011 9:22 am

Re: Bang Saray House Build

Postby rchapstick » Fri Aug 18, 2017 6:46 am

image(43).jpeg


image(44).jpeg


IMG_1842[1].JPG


IMG_1840[1].JPG


image(42).jpeg


image(45).jpeg


image(21).jpeg
rchapstick
 
Posts: 72
Joined: Sun Oct 23, 2011 9:22 am

Re: Bang Saray House Build

Postby rchapstick » Fri Aug 18, 2017 7:01 am

Then the roof beams were formed, poured, and left to cure. We also started the system room about this time.

After that, they formed the walls. I used 7cm qcon aerated block for the guest house (later used 20cm block for the main house).

20140503_104300.jpg


20140503_143642.jpg


20140504_162809.jpg


20140504_162740.jpg


20140505_150048.jpg


20140512_170659.jpg


20140512_170528.jpg
rchapstick
 
Posts: 72
Joined: Sun Oct 23, 2011 9:22 am

Re: Bang Saray House Build

Postby rchapstick » Fri Aug 18, 2017 7:04 am

20140512_170558.jpg


20140512_170852.jpg
rchapstick
 
Posts: 72
Joined: Sun Oct 23, 2011 9:22 am

Re: Bang Saray House Build

Postby Sometimewoodworker » Fri Aug 18, 2017 5:45 pm

rchapstick wrote:One other point to make on project management. An engineer needs to sign off on the design of the project, and is also supposed to sign off on the the actual build. Most builders employ their own engineer, and will usually rubber stamp whatever their boss wants to do. However, I insisted that the engineer report to me, and I specified points in the build that he would inspect (pilings, footings, steel for structural beams, etc.) I also got an electrical engineer to review the electric plan, and to inspect and sign off at a couple of points during the build. My builder had no problem with this, and it was money well spent, if but of piece of mind.

That is not always true.

The signing off on a project and registering it with the Amper is dependent on where you are building. The closer you are to a city or town the more likely it is to be required.

In our villages there is no requirement for any plans to be registered, SWMBO designed grand Mum's house herself on a couple of sheets of A4.
Sometimewoodworker
 
Posts: 1810
Joined: Wed Sep 19, 2007 1:22 pm
Location: Non Sa-At / Tokyo

Re: Bang Saray House Build

Postby rchapstick » Fri Aug 18, 2017 10:22 pm

[/quote]
That is not always true.

The signing off on a project and registering it with the Amper is dependent on where you are building. The closer you are to a city or town the more likely it is to be required.

In our villages there is no requirement for any plans to be registered, SWMBO designed grand Mum's house herself on a couple of sheets of A4.[/quote]

Fair enough. The Navy approval is pretty unique to the Sattahip area, as I understand
rchapstick
 
Posts: 72
Joined: Sun Oct 23, 2011 9:22 am