House near Rattanaburi, surin

Any story related to building in the LOS, whether everything turned out hunky dory or not!

Moderators: MGV12, BKKBILL, fredlk

House near Rattanaburi, surin

Postby tertim » Sun May 01, 2016 8:19 am

Hello
Well here goes with the start of our build :-
I have now finalised our layout and it's completely different from my original ideas (posted in design and planning) wife is happy so i'm happy.

[/attachment]
IMG_20160501_072843.jpg


Flew from Phuket on the 7 march to see wife's land for the first time, just over 1 rai with many trees and nice location just off the village road. Started clearing land the next day and it looks like we will need a retaining wall in one corner of our boundary and also there is evidence of severe water erosion on another boundary.

IMG_20160501_072843.jpg


pop kan mia
Attachments
IMG_20160310_121803.jpg
IMG_20160310_121840.jpg
IMG_20160310_121633.jpg
IMG_20160310_121614.jpg
IMG_20160305_085533.jpg
IMG_20160306_080951.jpg
tertim
 
Posts: 156
Joined: Wed Nov 18, 2015 8:10 am
Location: Rattanaburi, surin

Re: House near Rattanaburi, surin

Postby tertim » Sun May 01, 2016 9:15 am

Day 3
Tractor arrived to do some serious clearing then 70 loads of fill and levelling off very busy day.

IMG_20160311_091505.jpg
IMG_20160311_091505.jpg
IMG_20160311_091505.jpg
Attachments
IMG_20160312_100032.jpg
IMG_20160312_094059.jpg
IMG_20160312_100125.jpg
tertim
 
Posts: 156
Joined: Wed Nov 18, 2015 8:10 am
Location: Rattanaburi, surin

Re: House near Rattanaburi, surin

Postby Marlon » Sun May 01, 2016 9:39 am

Design looks good mate. Are you planning on engaging a contractor for the job, or different crews for each section? Or sitting on it for a while.
Marlon
 
Posts: 23
Joined: Sun Dec 27, 2009 11:45 am
Location: Phu Sing district. Sisaket.

Re: House near Rattanaburi, surin

Postby tertim » Sun May 01, 2016 10:09 am

Marlon wrote:Design looks good mate. Are you planning on engaging a contractor for the job, or different crews for each section? Or sitting on it for a while.


Hi Marlon
I am working with my wife and cousin and between the three of us hope to complete most of the build, I will engage extra labour as and when needed, also electrics and plumbing we will do ourselves. I will employ a subcontractor for the rendering but that's about it,

I am back in Phuket now to pack up our belongings and hand over the house keys to the landlord. We shall return to Rattanaburi around the 26 May to start phase 2 of our build, phase 1 :- ground cleared and filled, pads set out and dug, concrete pads, stub columns, septic tanks, back fill and level, land drains all completed. I will be posting more pics of phase 1 over the next few days.

pop kan mai
tertim
 
Posts: 156
Joined: Wed Nov 18, 2015 8:10 am
Location: Rattanaburi, surin

Re: House near Rattanaburi, surin

Postby tertim » Mon May 02, 2016 7:58 am

After much deliberation and the shaman's directions the final position of our house was established so now we could finally get on with setting out ( Overall size 14Mx8.6M ) and erecting profiles. The pads were marked out with cement for the digger driver and all we needed now was a machine, unfortunately that took a week to arrive so we busied ourselves with erecting our workshop and making the rebar.


IMG_20160315_105317.jpg
Initial setting out.
IMG_20160313_133104.jpg
Day off at the nearby Moon river
IMG_20160320_095930.jpg
Marking the pads for excavation
IMG_20160321_090020.jpg
Our workshop
IMG_20160322_073509.jpg
Making 50mm spacers for the pads rebar
IMG_20160323_114714.jpg
Straightening the rebar
IMG_20160323_180009.jpg
Rebar for pads
tertim
 
Posts: 156
Joined: Wed Nov 18, 2015 8:10 am
Location: Rattanaburi, surin

Re: House near Rattanaburi, surin

Postby tertim » Mon May 02, 2016 10:35 pm

IMG_20160325_133147.jpg
Pipe for under entrance and poo rings
IMG_20160323_180044.jpg
Bending jig
IMG_20160325_133218.jpg
site entrance
IMG_20160325_133336.jpg
Soil erosion
IMG_20160323_164554.jpg
Boundary where retaining wall needed
IMG_20160330_091100.jpg
More soil erosion
tertim
 
Posts: 156
Joined: Wed Nov 18, 2015 8:10 am
Location: Rattanaburi, surin

Re: House near Rattanaburi, surin

Postby pipoz » Tue May 03, 2016 10:16 am

Nice strong looking Bending jig

Can you bend a DB 16 bar on it

pipoz
User avatar
pipoz
 
Posts: 1862
Joined: Mon Jan 23, 2012 10:41 pm
Location: Udon Thani Sometimes

Re: House near Rattanaburi, surin

Postby tertim » Tue May 03, 2016 11:46 am

pipoz wrote:Nice strong looking Bending jig

Can you bend a DB 16 bar on it

pipoz


I doubt it, would probably pull our workshop down!! I only made it for bending up to 12mm as that is the maximum thickness we are using. The bar is placed in the jig and a metal pipe inserted around the bar then bend, very easy and quick, we are making all the stirrups ourselves ( therapeutic )

Pop kan mai
tertim
 
Posts: 156
Joined: Wed Nov 18, 2015 8:10 am
Location: Rattanaburi, surin

Re: House near Rattanaburi, surin

Postby tertim » Wed May 04, 2016 8:15 am

Day 15
Went to the local office to arrange for a temporary electric supply, paid B6400 deposit which they explained would be refunded when our permanent supply was installed, said they would be along in 2 days to install meter and connect us.
Well 2 days later a guy arrived on his motor bike with a new meter, shimmied up the concrete pole made the connection and even helped to string our cable across the road to a convenient tree and then down to our cu fixed to a pole.
The water supply was even easier, headman told us to put the pipe down and he would turn off the water so we could make the connection ourselves!!!! So we dug a shallow trench along the verge and after many attempts managed to find the mains pipe, it was now 6.00PM and the sun sinking rapidly when Sahmrun (our one and only worker) decided that he would make the connection now, I queried the length of time time it would take for the water to drain out but as usual he replied NO PROBLEM. It's now 2 hours since the water was turned off and we're still waiting for the water to stop flowing so we can make a joint, the whole village has been without water for this time and people are complaining, I decided to make a diplomatic withdrawal and leave Sahmrun to take the flak, after all it was his decision!!!! Now he could blame the crazy fahrang for turning off the water at such a busy time!!!!!
IMG_20160330_091152.jpg
Temporary electric supply
IMG_20160402_111524.jpg
Water supply
IMG_20160402_103731.jpg
Water meter
tertim
 
Posts: 156
Joined: Wed Nov 18, 2015 8:10 am
Location: Rattanaburi, surin

Re: House near Rattanaburi, surin

Postby tertim » Wed May 04, 2016 9:14 pm

Day 20
Makro finally arrived and started work at 9.00 and then within minutes broke down, took about 2 hours to replace burst hydraulic pipe. All the bases were clearly marked so we let him get on with it whilst we did some other work. As it turns this was a mistake, we had to do quite a bit of trimming and cleaning up afterwards the worst base being 30cm off.



IMG_20160330_090856.jpg
Good quality sharp sand free from the Moon river
IMG_20160330_091216.jpg
Macro arrives at last all we need now is a driver
IMG_20160330_100721.jpg
Keeping the dust down to appease the neighbours
IMG_20160330_143625.jpg
first pad dug 14 more to go
IMG_20160331_161830.jpg
Trimming the bases
tertim
 
Posts: 156
Joined: Wed Nov 18, 2015 8:10 am
Location: Rattanaburi, surin

Re: House near Rattanaburi, surin

Postby tertim » Thu May 05, 2016 1:40 pm

Day 20


IMG_20160330_143341.jpg
Concrete pipe under entrance
IMG_20160401_085953.jpg
Cleaning out the well
IMG_20160401_085913.jpg
Yes there is a guy down there no ladders or ropes just climbed down.
IMG_20160402_110623.jpg
Blinding prior to placing rebar and concreting
IMG_20160403_113956.jpg
Blocks to form shutter for concrete pads, if you look closely you can see column marked in red, had to trim a bit to get correct size.
tertim
 
Posts: 156
Joined: Wed Nov 18, 2015 8:10 am
Location: Rattanaburi, surin

Re: House near Rattanaburi, surin

Postby tertim » Fri May 06, 2016 8:26 am

Day 25
Yam (wife) went to see local shaman to ask about a lucky day to start building, after much consideration and peering at his charts decided 1st April was most propitious, so that was it April fools day!!!!
Well here we are 1st april not feeling foolish just totally bewildered, after much consideration the shaman decided on the two columns to be erected and to me it was total chaos there after. Many people mixing concrete (soup), steel placed, concrete poured I insisted on more cement to try and counteract the excess water, thank god we are only pouring two I will be back in charge tomorrow.
Bought some steel shuttering from Thaiwatsadu it was on special offer but when we went to pay they said that offer finished last month!!!! so why are the price tags still still showing the offer?? To cut a long story short we managed to obtain the offer price, much to my wife's embarrassment for me insisting that they should honour the offer, it's their fault if they forgot (lazy) to remove the price labels.

IMG_20160401_103220.jpg
First pad completed
IMG_20160401_103235.jpg
concreting the first pad
IMG_20160401_103816.jpg
The shaman preparing for the blessing ceremony
IMG_20160401_111010.jpg
Blessing ceremony
IMG_20160401_135005.jpg
IMG_20160402_110541.jpg
Our concrete mixing crew
IMG_20160407_082409.jpg
First stub column
tertim
 
Posts: 156
Joined: Wed Nov 18, 2015 8:10 am
Location: Rattanaburi, surin

Re: House near Rattanaburi, surin

Postby olavhome » Fri May 06, 2016 12:33 pm

Good luck with Your building project. :D
How about the man in the well, has he returned to surface?
If not, at least send some rice :D
olavhome
 
Posts: 406
Joined: Sun Apr 03, 2011 10:12 pm

Re: House near Rattanaburi, surin

Postby tertim » Fri May 06, 2016 4:51 pm

olavhome wrote:Good luck with Your building project. :D
How about the man in the well, has he returned to surface?
If not, at least send some rice :D

Hello olavhome thank you for your good wishes we all need good luck no matter how capable we think we are.
The man down the well :- as soon as the blessing party was over the food and booze began to flow he shot up like a rabbit out of a hat and declared he had reached the bottom (8M) and all was well !!!!
The next day the water level had risen to 3M below ground giving us 5M of water about 2500L this being the dry season I was very pleased so now we have 3 sources of water Mains, well and rain water harvesting.

Pop kan mai
tertim
 
Posts: 156
Joined: Wed Nov 18, 2015 8:10 am
Location: Rattanaburi, surin

Re: House near Rattanaburi, surin

Postby olavhome » Fri May 06, 2016 11:09 pm

Happy all well :D
Just remembered: If you take water inside a plastic bottle and leave it for a couple of days you will see it turns red/brown
if much iron.