When I get back (mar 31 maybe) first project will be to get electric run to the house. Nu has already got the "House" book.
Then get a fridge, that will not be the " open season, anyone can take anything anytime" FRIDGE. It has not really been a big problem, there have been a few times that I bought milk, beer, fruit, etc.... Opened the door and that Item was gone. Seems to be NO concept of if you eat/drink the last of something, replace it.....at the very least, fooking say something.
Rant Mode Off......................
When I was in grade school(1-6), we had a grade/mark for "Respects property of others" This is not in the Thai culture at all.
What we do now, is put in fridge or pantry what is for everybody, and rest stashed.
I have a small 4 circuit box's for the ground floor, and wire. Still need to buy a couple more outlets, have light switchs (10), and a couple of 36" single tube lights. Down stairs will all be surface run , Thai style
Up stairs, I want cavity walls , at least in the master bedroom/onsuite that I will have aircon in. There we will run the wire in the walls.
Tile is also planned at least for the 6X6M2 that is now at lock up stage. Along with the bathroom. I have already bought the sink/bog/shower and mirror.
Exaust fan is already installed...
That is about it for now
