happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Top rated - Cool Thai House Phase 2
IMG_1182.jpg
Gas Melting StationHere is the rig they used to melt the PVC piping in place. dozer00000
(0 votes)
IMG_1179.jpg
Franklin PumpA view of the pump without the exterior housing. dozer00000
(0 votes)
IMG_1172.jpg
Drill Rig Set UpThe rig used to drill the hole with the shaft harness upright and in position. dozer00000
(0 votes)
IMG_1169.jpg
Drill Rig with Drilling ShaftsThe drilling rig. The shafts in the foreground are for drilling and attach to the trucks drill harness. dozer00000
(0 votes)
IMG_1167.jpg
Well Rig Gets to LandJust enough clearance to get into the land. This is a utility gate not used as a regular entrance, as it allows entry from someone else's land (currently unoccupied). Was slated for removal, glad we kept it.dozer00000
(0 votes)
     
437 files on 37 page(s) 37

Debug Info 
Debug Output: show / hide