happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > House Construction > Cool Thai House Phase 2

Most viewed - Cool Thai House Phase 2
IMG_1710.jpg
Formwork Assembly110 viewsThe metal forms are clipped into place using u bolts. They are rented at a daily rate depending with a price for each piece used. dozer
IMG_3420.jpg
Edge Tiles Replaced110 viewsThe edge tiles are replaced here without excess space between the tile edge and the fascia board. 2 commentsdozer
IMG_1335.jpg
Column Framework set in Place109 viewsThe column frameworks are held upright by using pieces of 1 x 3" timber. dozer
IMG_1591.jpg
Soil Compacting109 viewsUsing a rented vibrator to compact the soil. There are benzine and diesel models rated by weight. dozer
IMG_1640.jpg
Patio107 viewsThe patio was poured 5 cm lower than the normal floor. Note that the ground beam on the outside of the patio was lowered by 5 cm. dozer
IMG_2076.jpg
Squaring a Beam107 viewsThe window opening is squared using a straight edge tool. dozer
IMG_1457.jpg
Rebar Vertical Supports106 viewsWiring the vertical 6mm rebar into place each 20 cm. dozer
IMG_1529.jpg
Beam Pour106 viewsA vibrator being used during the ground beam pour to ensure minimum voids in the concrete. dozer
IMG_1612.jpg
Damp Course106 viewsAnother view of the damp course plastic sheeting. dozer
IMG_1689.jpg
Spacers in Walkway106 viewsPreparing for the walk way pour around the exterior of the house. Although they are placing spacers they don't really work well for a floor pour as the rebar gets stepped on and bends. Here they are using 6mm rebar and wiring it together as opposed to the prefab welded rebar mesh. dozer
IMG_1742.jpg
Vibrating the Column Pour106 viewsThe vibrator is used during the column pour to ensure minimum voids in the completed column.dozer
IMG_1926.jpg
Laying Blocks105 viewsPreparing the hole in the column for the 6mm rebar to be placed and protrude into the block adjacent to the column.dozer
437 files on 37 page(s) 3

Debug Info 
Debug Output: show / hide