|
![](images/spacer.gif)
Most viewed - Cool Thai House Phase 2 |
![Filename=IMG_1513.jpg
Filesize=508KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1513.jpg](albums/userpics/10002/thumb_IMG_1513.jpg)
Leveling the Toilet Pipe72 viewsAny of the piping which doesn't come up vertical straight causes problems with fittings and attachments. The pvc is leveled and will be secured in place prior to the pour of concrete.dozer
|
|
![Filename=DSCN0480.jpg
Filesize=204KiB
Dimensions=1280x960
Date added=Sep 27, 2011 DSCN0480.jpg](albums/userpics/10002/thumb_DSCN0480.jpg)
Kitchen/Living Area72 viewsComing into the house there is a great room area which is an entry area, kitchen and study. dozer
|
|
![Filename=IMG_2224.jpg
Filesize=336KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_2224.jpg](albums/userpics/10002/thumb_IMG_2224.jpg)
Junction Boxes71 viewsThe PVC plastic junction boxes are set in place which the screw type connectors. dozer
|
|
![Filename=IMG_2519.jpg
Filesize=490KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_2519.jpg](albums/userpics/10002/thumb_IMG_2519.jpg)
Plumbing Help??71 viewsHelped install the pump and fixtures in the house but unfortunately messed up a pump washer and bolt which took 6 weeks to get a replacement from Mitsubishi. dozer
|
|
![Filename=DSCN0475.jpg
Filesize=328KiB
Dimensions=1280x960
Date added=Sep 27, 2011 DSCN0475.jpg](albums/userpics/10002/thumb_DSCN0475.jpg)
Drive Way and Roll Up Door70 viewsThe parking lot along with a 2m side covered area. There are two storage/utility rooms with roll up doors. The ceiling is done using Chang brand 'smart board' which is vented to allow air flow in the attic.dozer
|
|
![Filename=IMG_2261.jpg
Filesize=268KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_2261.jpg](albums/userpics/10002/thumb_IMG_2261.jpg)
Main Circuit Box69 viewsThe eventual location where the main circuit box will go. dozer
|
|
![Filename=IMG_2861.jpg
Filesize=299KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_2861.jpg](albums/userpics/10002/thumb_IMG_2861.jpg)
Recessed Light Fixture69 viewsA recessed light fixture with wire nut tapeless connections.dozer
|
|
![Filename=DSCN0465.jpg
Filesize=192KiB
Dimensions=1280x960
Date added=Sep 26, 2011 DSCN0465.jpg](albums/userpics/10002/thumb_DSCN0465.jpg)
Junction Box69 viewsA junction box in the attic. The connections are done with wire nut connectors and no tape.dozer
|
|
![Filename=IMG_1516.jpg
Filesize=521KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1516.jpg](albums/userpics/10002/thumb_IMG_1516.jpg)
1 and 1/2 bathrooms69 viewsThe view of the beam setup for 1 and 1/2 bathrooms. dozer
|
|
![Filename=IMG_1729.jpg
Filesize=431KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1729.jpg](albums/userpics/10002/thumb_IMG_1729.jpg)
Rough Plumbing Layout69 viewsAll of the inbound water pipes (1/2") and drain pipes ready for water pressure test. dozer
|
|
![Filename=IMG_1879.jpg
Filesize=564KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1879.jpg](albums/userpics/10002/thumb_IMG_1879.jpg)
Bathroom Layout69 viewsBathroom nearing readiness to have the floors poured. The main floor will be poured first and then later the shower floors will be poured as they are at a lower level. dozer
|
|
![Filename=IMG_1611.jpg
Filesize=543KiB
Dimensions=1280x960
Date added=Sep 26, 2011 IMG_1611.jpg](albums/userpics/10002/thumb_IMG_1611.jpg)
Burying the PVC Pipe68 viewsThe PVC pipe will is being buried under where the driveway will be poured. The PVC pipe is a space holder for the HDPE underground electric conduit. dozer
|
|
437 files on 37 page(s) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
11 | ![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
|
![](images/spacer.gif)
|
|
|