happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Last additions - Max&Bee-in-CM
IMG_1280.JPG
Last day working on the roof metal - finishing touchesMaking the welds strongerMax&Bee-in-CMSep 29, 2010
IMG_1315.JPG
Last day working on the roof metal - finishing touchesMaking all the welds stronger and painting the jointsMax&Bee-in-CMSep 29, 2010
IMG_1430.JPG
Installing the side roof tilesMax&Bee-in-CMSep 29, 2010
IMG_1458.JPG
Roof tile work resumes now that the metal is almost finishedMax&Bee-in-CMSep 29, 2010
IMG_1465.JPG
Last day working on the roof metal - finishing touchesMax&Bee-in-CMSep 29, 2010
IMG_1093.JPG
Making the big support baseMax&Bee-in-CMSep 29, 2010
IMG_1095.JPG
Working on the roofMax&Bee-in-CMSep 29, 2010
IMG_1100.JPG
Bottom of T support beamWe cut to size of 20cm x 20cm the 1 inch thick steel, to form the base of the T beam. It is located on top of a ground beam, so will not puncture through the concrete.Max&Bee-in-CMSep 29, 2010
IMG_1101.JPG
The T support beam holding up the roof at the topMax&Bee-in-CMSep 29, 2010
IMG_1191.JPG
Support for beamWe needed to make a large foundation for the support of the beams helping to hold up the roof, as there is no ground beam under this point. Max&Bee-in-CMSep 29, 2010
IMG_0989.JPG
Welding the support columnTwo steel beams (22kg) are welded in a T bar configuration to help support the roofMax&Bee-in-CMSep 29, 2010
IMG_0999.JPG
Floor structure for support columnThis one is in the master bathroom, embedded in the double wallMax&Bee-in-CMSep 29, 2010
307 files on 26 page(s) 1

Debug Info 
Debug Output: show / hide