happy builder

 Coolthaihouse Photo Gallery

Construction Photos
Home > User galleries > Rick B

Rick B's House


51_-_Side_Deck_-_091908.JPG

Progress photos of our house construction in Sam Chuk, Suphanburi.

92 files, last one added on Jan 20, 2009
Album viewed 137 times

 

1 albums on 1 page(s)

Last additions - Rick B's Gallery
51_-_Side_Deck_-_091908.JPG
View of side deck1 commentsRick BJan 20, 2009
52_-_Side_and_Rear_-_091908.JPG
Rear and side view of houseRick BJan 20, 2009
53_-_Chedi_-_091908.JPG
The family chedi in the back yard1 commentsRick BJan 20, 2009
46_-_Concrete_Driveway_-_072208.JPG
View of driveway just pouredRick BJan 20, 2009

Random files - Rick B's Gallery
5_-_Front_Steps_Forms_Removed_-_042308.JPG
The front steps after the forms were removed and before the tiles were laid.Rick B
37_-_Inner_Staircase_-_062608.JPG
Wooden stairs being installedRick B
47_-_Front_Fence_-_091908.JPG
View of front of perimeter wall and pedestrian gate before paintingRick B
DSC02179_-_2nd_Floor_Beams_-_012108.JPG
Second floor beams after being poured looking at the back of the house (on left) and the side deck (on right). Note, the columns without second floor beams are single-storey columns and will support the lower roof sections over the side deck and the Thai kitchen in the rear.Rick B
4_-_Front_Steps_Forms_-_042308.JPG
Front steps' formsRick B
0012_-_Delivering_Piles_-_110307.JPG
Piles being deliveredRick B
7_-_Side_and_Rear_Rendered__-_051908.JPG
Side and rear after rendering wallsRick B
DSC02173_-_Floor_Slabs_-_010908.JPG
Floor slabs being laid in place.Rick B